Relocating the Value Chain: Offshoring and Agglomeration in the Global Economy

Working Paper: CEPR ID: DP8163

Authors: Richard Baldwin; Anthony J. Venables

Abstract: Global production sharing is determined by international cost differences and frictions related to the costs of unbundling stages spatially. The interaction between these forces depends on engineering details of the production process with two extremes being ?snakes? and ?spiders?. Snakes are processes whose sequencing is dictated by engineering; spiders involve the assembly of parts in no particular order. This paper studies spatial unbundling as frictions fall, showing that outcomes are very different for snakes and spiders, even if they share some features. Both snakes and spiders have in common a property that lower frictions produce discontinuous location changes and ?overshooting?. Parts may move against their comparative costs because of proximity benefits, and further reductions in frictions lead these parts to be ?reshored?. Predictions for trade volumes and the number of fragmented stages are quite different in the two cases. For spiders, a part crosses borders at most twice; the value of trade increases monotonically as frictions fall, except when the assembler relocates and the direction of parts trade is reversed. For snakes the volume of trade and number of endogenously determined stages is bounded only by the fragmentation of the underlying engineering process, and lower frictions monotonically increase trade volumes.

Keywords: agglomeration; assembly; fragmentation; offshoring; parts and components; vertical linkages

JEL Codes: F1; F23; R3


Causal Claims Network Graph

Edges that are evidenced by causal inference methods are in orange, and the rest are in light blue.


Causal Claims

CauseEffect
reductions in trade costs (F12)relocation of production stages (L23)
cost differences + agglomeration forces (F12)production decisions (L23)
reductions in trade costs (F12)overshooting in offshoring (F23)
engineering of products (L23)configuration of production stages (L23)
coordination failures (P11)production location decisions (R32)

Back to index